SmartFix40 Improvements I-40

CITY: Knoxville
COUNTRY/STATE: Knox Country, TN
GEN. CONTRACTOR: BB SmartFIX Contructors, a joint venture between Charles Blalock and Sons, Inc. and Bell and Associates

PROJECT DESCRIPTION

Originally constructed through Knoxville in the 1960s, I-40 has long been constricted by urban development around the downtown interchanges. Over the years, Knoxville’s growth not only led to a dramatic increase in traffic along I-40 but also significantly limited the available space around the interstate for widening. This was particularly true near the Broadway and James White Parkway interchanges, a place known as “Malfunction Junction” among local commuters.

In 2005, the Tennessee Department of Transportation began an accelerated, multi-phase plan to widen and improve I-40 through downtown Knoxville. Following widening projects along I-40 east and west of downtown, the plan finally addressed the bottleneck of traffic congestion near James White Parkway. Known as SmartFIX40, the plan called for two projects, each with two phases of work. Project One included an $85 million reconstruction and realignment of Hall of Fame Drive and James White Parkway. Project Two, a $105 million joint venture between Charles Blalock and Sons Inc. and Bell and Associates, included a 14-month closure of I-40 to complete the widening project.

The goal of the SmartFIX40 schedule was to accelerate construction by 2-3 years by allowing a complete closure of the interstate. During the 14 month closure period, crews from Blalock and Bell completed the six-lane widening through downtown and constructed 13 bridges, 15 retaining walls, 3 noise walls, 7 ramps, and 12 side roads. Crews worked around the clock to move over 600,000 tons of dirt, place nearly 20,000 yards of concrete, and pave over 250,000 tons of asphalt along the widened interstate. On June 12, 2009, I-40 officially reopened to traffic, 18 days ahead of schedule.

Services Provided For SmartFix40 Improvements I-40:
  • products & materials
  • pumping and conveying
  • precast
  • ready mix
  • concrete
  • asphalt and paving
  • road construction
  • site preparation
  • utility installation
  • trucking
  • demolition and waste services
  • crane services
  • building materials and supplies
Request More Information
1935
The year Charlie Blalock built his first saw mill that would later become Blalock Ready Mix.

Our Story

We believe that hard work and integrity are the foundation of a strong organization. For more than 80 years, we’ve been committed to bringing prosperity to our employees, clients, and community through our work in the construction industry. Our values have helped us grow from the ground up, guiding us as we’ve expanded from a single employee to more than 700 strong. But our story isn’t inspired by numbers; it’s influenced by people. It starts with one man’s mission and continues with a thriving enterprise that has helped shape the progress of an entire region. We’ve built our story–now let us build yours.