- Services
- Products
- About Us
- Contact
- Join Our Team
- Blalock Ready Mix
- Employee Portal
©2024 Blalock Companies™
All Rights Reserved
Powered by BigWheel
Project Overview
Our Work
U.S. Highway 321 Bridges
The Loudon Bridge project for State Route 73 (US 321) includes widening a 1.71 mile section on TN SR-73 / US 321 to four lanes, with the construction of three new bridges over the Tennessee River, Tellico Canal, and Norfolk Southern railway. The primary bridge is a welded steel girder spanning more than 4,000 feet across the Tennessee River below the Fort Loudoun dam. This new bridge replaces the J. Carmichael Greer Bridge, which will be removed from the top of the dam as part of the project. Charles Blalock and Sons performed all of the road widening and bridge construction, including extensive marine construction in the Tennessee River for the bridge foundations. This called for an extensive fleet of barges and cranes to place bridge components across the river.
Additionally, bridge construction over the navigation channel of the Tennessee River required constant coordination with the U.S. Coast Guard and the U.S. Army Corps of Engineers to maintain open river traffic to the lock system at Fort Loudoun Dam. Blalock Ready Mix provided concrete pumping services, and Blalock Equipment Corporation provided dirt and aggregate hauling.
Project Details: At a Glance
Start
June 15, 2017
End
Spring 2018
Project Budget
$69.3M
Blalock Services Provided
Blalock Project Archive
Want to see more? Check out the full archive of our past projects!
Explore Project ArchiveBlalock Locations
Ac odio tempor orci dapibus. Placerat vestibulum lectus mauris ultrices eros.
Find Us Near YouBlalock Careers
Ac odio tempor orci dapibus. Placerat vestibulum lectus mauris ultrices eros.
Explore Opportunities